Back to Portfolio News

First P2 Elements Launched in Edinburgh - 15 Feb 2010

PWP recently launched the first tubes of the E.On P2 Pelamis machine. With specialist heavy-lift equipment from Mammoet, the 190tonne tubes were moved from PWP’s fabrication hall to the nearby quayside. From there they were individually lowered into Leith Docks where they joint union was made.  A further three tubes will be launched in March for final assembly and ballasting.

 

Back to Portfolio News